Silver Motor with Long Lead
Description
Tethered motor with a long lead. Supports classic sized rods. Two AA batteries required to run (not included).
Additional information
- Weight
- 94.5 g
- Color
Related Products
Blue Motor
Temporarily sold out
Add to cartGreen Motor
Temporarily sold out
Add to cartLarge Orange Turbo Launcher
Only 6 left - order soon.
Add to cartBlack Motor w/ Yellow Axles
Temporarily sold out
Add to cartSolar Motor (Metallic Green)
Temporarily sold out
Add to cart