Silver Motor with Long Lead
Description
Tethered motor with a long lead. Supports classic sized rods. Two AA batteries required to run (not included).
Additional information
- Weight
- 94.5 g
- Color
Related Products
Solar Motor
Temporarily sold out
Add to cartYellow Light Module
Only 1 left - order soon.
Add to cartSpring Motor
Only 8 left - order soon.
Add to cartBlue Motor
Temporarily sold out
Add to cart12V Motor Classic Sized
Only 1 left - order soon.
Add to cart