Silver Motor with Long Lead
Description
Tethered motor with a long lead. Supports classic sized rods. Two AA batteries required to run (not included).
Additional information
- Weight
- 94.5 g
- Color
Related Products
Solar Motor (Metallic Green)
Temporarily sold out
Add to cartGray Sound Unit
Temporarily sold out
Add to cartBlue Motor
Temporarily sold out
Add to cartSilver Solar Capacitor
Temporarily sold out
Add to cartRed Motor
Temporarily sold out
Add to cart