Silver Motor with Long Lead
Description
Tethered motor with a long lead. Supports classic sized rods. Two AA batteries required to run (not included).
Additional information
- Weight
- 94.5 g
- Color
Related Products
Solar Panel
Temporarily sold out
Add to cartSilver Solar Capacitor
Temporarily sold out
Add to cartRescue Lift Wind Up Motor
Temporarily sold out
Add to cartSpring Motor
Only 8 left - order soon.
Add to cartRed + Clear Motor (Short Lead)
Temporarily sold out
Add to cart