Purple Micro Motor (Long Lead)
Description
Micro sized two part motor is connected with a long wired lead. Motor has a unique connection (as displayed in pictures), that are used to turn specialized parts. Needs 2x AA Batteries to run (batteries not included).
Additional information
- Weight
- 89.1 g
- Color
Related Products
Red Motor
Only 2 left - order soon.
Add to cart12V AC Adaptor Cord/Plug (US)
Temporarily sold out
Add to cartSpring Motor
Temporarily sold out
Add to cartLarge Orange Turbo Launcher
Temporarily sold out
Add to cartSolar Panel
Temporarily sold out
Add to cart