Menu

1

$13.12

Purple Micro Motor (Long Lead)

  • knex-purple-micro-motor-92875M-2
  • knex-purple-micro-motor-92875M-2

Description

Micro sized two part motor is connected with a long wired lead. Motor has a unique connection (as displayed in... read more

Temporarily sold out

SKU:
92875M
Category:
Weight:
89.1 g
Color:

Price

$19.85/ea

Quantity

- +

Total

$19.85/ea

Temporarily sold out

Description

Micro sized two part motor is connected with a long wired lead. Motor has a unique connection (as displayed in pictures), that are used to turn specialized parts. Needs 2x AA Batteries to run (batteries not included).

Additional information

Weight
89.1 g
Color

Join Waitlist We generally have more stock on hand than our website shows. So stock could be updated quickly! We try to restock at least once a week if possible depending on part supplies.