Motors & Electronic Components
Out of Stock
Silver Motor with Long Lead
Tethered motor with a long lead. Supports classic sized rods. Two AA batteries required to run (not included).
Speedy Shipping
In stock parts ready to ship fast
Any Quantity
Order by the piece or buy in bulk
Product Description
Tethered motor with a long lead. Supports classic sized rods. Two AA batteries required to run (not included).
Technical Specifications
- Part Number
- 3278002
- Color
- Silver
- Weight
- 94.5 g
Additional Information
Packaging: Each part is individually inspected and carefully packaged.
Safety: Not suitable for children under 3 years due to small parts.