Silver Motor with Long Lead
Description
Tethered motor with a long lead. Supports classic sized rods. Two AA batteries required to run (not included).
Additional information
- Weight
- 94.5 g
- Color
Related Products
Rescue Lift Wind Up Motor
Temporarily sold out
Add to cartSilver Solar Capacitor
Temporarily sold out
Add to cartSilver Motor
Temporarily sold out
Add to cartSolar Panel
Temporarily sold out
Add to cartSolor Motor – No Shaft (Orange)
Temporarily sold out
Add to cart