Silver Motor with Long Lead
Description
Tethered motor with a long lead. Supports classic sized rods. Two AA batteries required to run (not included).
Additional information
- Weight
- 94.5 g
- Color
Related Products
Blue Sound Unit
Temporarily sold out
Add to cartOrange Sound Unit
Temporarily sold out
Add to cart12V Motor Classic Sized
Temporarily sold out
Add to cartSolor Motor – No Shaft (Orange)
Temporarily sold out
Add to cartRescue Lift Wind Up Motor
Temporarily sold out
Add to cart