Purple Micro Motor (Long Lead)

Micro sized two part motor is connected with a long wired lead. Motor has a unique connection (as displayed in pictures), that are used to turn specialized parts. Needs 2x AA Batteries to run (batteries not included).

Speedy Shipping

In stock parts ready to ship fast

Any Quantity

Order by the piece or buy in bulk

Specifications

Part Number 92875M
Weight 89.1 g
Color Purple

Product Description

Micro sized two part motor is connected with a long wired lead. Motor has a unique connection (as displayed in pictures), that are used to turn specialized parts. Needs 2x AA Batteries to run (batteries not included).

Join Waitlist We generally have more stock on hand than our website shows. So stock could be updated quickly! We try to restock at least once a week if possible depending on part supplies.