Purple Micro Motor (Long Lead)
Description
Micro sized two part motor is connected with a long wired lead. Motor has a unique connection (as displayed in pictures), that are used to turn specialized parts. Needs 2x AA Batteries to run (batteries not included).
Additional information
- Weight
- 89.1 g
- Color
Related Products

Red + Clear Motor (Long Lead)
Temporarily sold out
Add to cart
Red Motor
Only 2 left - order soon.
Add to cart
Silver Solar Capacitor
Temporarily sold out
Add to cart
Gray 3-Way Hub
Temporarily sold out
Add to cart
Solar Motor
Temporarily sold out
Add to cart