Motors & Electronic Components
Out of Stock
Red + Clear Motor (Long Lead)
Red motor handle with clear motor attachment by LONG wire lead. Has the ability to rotate forward and backwards. Powered by two AA batteries. (Batteries not included). SKU: 92875
Speedy Shipping
In stock parts ready to ship fast
Any Quantity
Order by the piece or buy in bulk
Product Description
Red motor handle with clear motor attachment by LONG wire lead. Has the ability to rotate forward and backwards. Powered by two AA batteries. (Batteries not included). SKU: 92875
Technical Specifications
- Part Number
- 92875
- Color
- Clear, Red
- Weight
- 92.6 g
Additional Information
Packaging: Each part is individually inspected and carefully packaged.
Safety: Not suitable for children under 3 years due to small parts.