Silver Motor with Long Lead
Description
Tethered motor with a long lead. Supports classic sized rods. Two AA batteries required to run (not included).
Additional information
- Weight
- 94.5 g
- Color
Related Products

Solor Motor – No Shaft (Orange)
Temporarily sold out
Add to cart
Yellow Light Module
Only 1 left - order soon.
Add to cart
Orange Sound Unit
Temporarily sold out
Add to cart
12V Motor Classic Sized
Temporarily sold out
Add to cart
Red + Clear Motor (Short Lead)
Temporarily sold out
Add to cart
