Silver Motor with Long Lead
Description
Tethered motor with a long lead. Supports classic sized rods. Two AA batteries required to run (not included).
Additional information
- Weight
- 94.5 g
- Color
Related Products
Blue Light-Up Rod – 161mm
Only 24 left - order soon.
Add to cartRed + Clear Motor (Short Lead)
Temporarily sold out
Add to cartBlue Sound Unit
Temporarily sold out
Add to cartBlue Motor
Temporarily sold out
Add to cartLarge Orange Turbo Launcher
Temporarily sold out
Add to cart