Purple Micro Motor (Long Lead)
Description
Micro sized two part motor is connected with a long wired lead. Motor has a unique connection (as displayed in pictures), that are used to turn specialized parts. Needs 2x AA Batteries to run (batteries not included).
Additional information
- Weight
- 89.1 g
- Color
Related Products
Rescue Lift Wind Up Motor
Temporarily sold out
Add to cartBlue Sound Unit
Temporarily sold out
Add to cart12V Motor Classic Sized
Only 1 left - order soon.
Add to cartBlue Light-Up Rod – 161mm
Only 24 left - order soon.
Add to cartSolor Motor – No Shaft (Orange)
Temporarily sold out
Add to cart