Motors & Electronic Components
Out of Stock
Gray & Clear Motor (Long Lead)
Two part motor attached with a long wired lead. Clear motor, gray battery pack. Motor runs at approximately 38 RPM. Can operate in both forward and reverse. Runs on 2x AA Batteries (not included).
Available Colors
Speedy Shipping
In stock parts ready to ship fast
Any Quantity
Order by the piece or buy in bulk
Product Description
Two part motor attached with a long wired lead. Clear motor, gray battery pack. Motor runs at approximately 38 RPM. Can operate in both forward and reverse. Runs on 2x AA Batteries (not included).
Technical Specifications
- Part Number
- 928751
- Color
- Gray
- Weight
- 64.85 g
Additional Information
Packaging: Each part is individually inspected and carefully packaged.
Safety: Not suitable for children under 3 years due to small parts.