Silver Motor with Long Lead
Description
Tethered motor with a long lead. Supports classic sized rods. Two AA batteries required to run (not included).
Additional information
- Weight
- 94.5 g
- Color
Related Products
Large Orange Turbo Launcher
Only 6 left - order soon.
Add to cart12V AC Adaptor Cord/Plug (US)
Temporarily sold out
Add to cartYellow Light Module
Only 1 left - order soon.
Add to cartSilver Motor
Temporarily sold out
Add to cart12V Motor Classic Sized
Only 1 left - order soon.
Add to cart